Data Clock Korea
データを見る
Construction

Construction Industry Survey (36/49)

KOSIS調査「Construction Industry Survey」の1統計表・138項目を、年次の数値とグラフで見ます。

산업세분류/종사자규모별 공사비용

先頭に戻る

산업별 건설업 · 종사자규모별 계

Construction Total

2008 253,551,6461000000won2024 477,696,1411000000won▲ +88.4%

General construction Total

2008 157,802,0561000000won2024 308,139,9091000000won▲ +95.3%

Building construction Total

2008 118,103,1621000000won2024 254,958,3421000000won▲ +115.9%

Residential building construction Total

2008 75,143,1541000000won2024 126,810,9231000000won▲ +68.8%

Non-residential building construction Total

2008 42,960,0071000000won2024 128,147,4191000000won▲ +198.3%

Heavy and civil engineering construction Total

2008 39,698,8941000000won2024 53,181,5671000000won▲ +34.0%

Land subdivision with land improvement Total

2008 1,942,9991000000won2024 987,5531000000won▼ −49.2%

Construction of civil engineering projects Total

2008 37,755,8941000000won2024 52,194,0141000000won▲ +38.2%

Specialized construction activities Total

2008 95,749,5901000000won2024 169,556,2321000000won▲ +77.1%

Site preparation and construction of foundation works and structures Total

2008 39,706,2301000000won2024 57,359,5361000000won▲ +44.5%

Site preparation and related construction Total

2008 12,402,0251000000won2024 14,388,8061000000won▲ +16.0%

Erecting assembling and framing structural parts and masonry works Total

2008 16,945,6561000000won2024 24,685,8361000000won▲ +45.7%

Other erecting assembling and framing structural parts and masonry works Total

2008 10,358,5471000000won2024 18,284,8941000000won▲ +76.5%

Construction of installing building equipment Total

2008 14,620,5891000000won2024 30,195,4731000000won▲ +106.5%

Construction of installing building equipment Total

2008 14,620,5891000000won2024 30,195,4731000000won▲ +106.5%

Electrical and communication works Total

2008 19,109,9231000000won2024 43,684,6791000000won▲ +128.6%

Electrical works Total

2008 12,899,5271000000won2024 31,380,1341000000won▲ +143.3%

Communication works Total

2008 6,210,3961000000won2024 12,304,5441000000won▲ +98.1%

Building completion and finishing Total

2008 21,103,3221000000won2024 38,316,5441000000won▲ +81.6%

Painting papering and finishing carpentry works Total

2008 10,059,2741000000won2024 18,481,5481000000won▲ +83.7%

Glazing works and joinery installation Total

2008 8,060,2441000000won2024 13,949,4381000000won▲ +73.1%

Other building completion and finishing Total

2008 2,983,8041000000won2024 5,885,5591000000won▲ +97.3%

Repair and maintenance works for construction works and supplementary facilities Total

2008 1,209,5241000000won2022 1,070,2661000000won▼ −11.5%

Construction Raw material costs

2008 79,819,7331000000won2024 127,946,6981000000won▲ +60.3%

General construction Raw material costs

2008 45,219,1601000000won2024 70,393,7831000000won▲ +55.7%

Building construction Raw material costs

2008 31,505,5651000000won2024 59,506,9061000000won▲ +88.9%

Residential building construction Raw material costs

2008 20,140,0201000000won2024 29,789,6401000000won▲ +47.9%

Non-residential building construction Raw material costs

2008 11,365,5441000000won2024 29,717,2661000000won▲ +161.5%

Heavy and civil engineering construction Raw material costs

2008 13,713,5951000000won2024 10,886,8771000000won▼ −20.6%

Land subdivision with land improvement Raw material costs

2008 415,6021000000won2024 144,4121000000won▼ −65.3%

Construction of civil engineering projects Raw material costs

2008 13,297,9921000000won2024 10,742,4651000000won▼ −19.2%

Specialized construction activities Raw material costs

2008 34,600,5721000000won2024 57,552,9141000000won▲ +66.3%

Site preparation and construction of foundation works and structures Raw material costs

2008 12,290,3871000000won2024 14,393,5061000000won▲ +17.1%

Site preparation and related construction Raw material costs

2008 3,033,9531000000won2024 3,050,5391000000won▲ +0.5%

Erecting assembling and framing structural parts and masonry works Raw material costs

2008 5,199,3131000000won2024 5,610,0341000000won▲ +7.9%

Other erecting assembling and framing structural parts and masonry works Raw material costs

2008 4,057,1201000000won2024 5,732,9331000000won▲ +41.3%

Construction of installing building equipment Raw material costs

2008 5,941,6781000000won2024 11,593,7751000000won▲ +95.1%

Construction of installing building equipment Raw material costs

2008 5,941,6781000000won2024 11,593,7751000000won▲ +95.1%

Electrical and communication works Raw material costs

2008 7,371,9871000000won2024 16,386,1011000000won▲ +122.3%

Electrical works Raw material costs

2008 5,408,1871000000won2024 11,745,7321000000won▲ +117.2%

Communication works Raw material costs

2008 1,963,8001000000won2024 4,640,3691000000won▲ +136.3%

Building completion and finishing Raw material costs

2008 8,582,2891000000won2024 15,179,5331000000won▲ +76.9%

Painting papering and finishing carpentry works Raw material costs

2008 3,908,4321000000won2024 6,969,7991000000won▲ +78.3%

Glazing works and joinery installation Raw material costs

2008 3,624,6671000000won2024 6,298,8311000000won▲ +73.8%

Other building completion and finishing Raw material costs

2008 1,049,1881000000won2024 1,910,9031000000won▲ +82.1%

Repair and maintenance works for construction works and supplementary facilities Raw material costs

2008 414,2291000000won2022 422,0431000000won▲ +1.9%

Construction Ancillary material costs

2008 2,475,5771000000won2024 4,896,0691000000won▲ +97.8%

General construction Ancillary material costs

2008 850,7551000000won2024 1,944,0691000000won▲ +128.5%

Building construction Ancillary material costs

2008 582,6601000000won2024 1,438,6951000000won▲ +146.9%

Residential building construction Ancillary material costs

2008 238,9741000000won2024 344,7791000000won▲ +44.3%

Non-residential building construction Ancillary material costs

2008 343,6861000000won2024 1,093,9161000000won▲ +218.3%

Heavy and civil engineering construction Ancillary material costs

2008 268,0941000000won2024 505,3741000000won▲ +88.5%

Land subdivision with land improvement Ancillary material costs

2008 16,6261000000won2024 10,8411000000won▼ −34.8%

Construction of civil engineering projects Ancillary material costs

2008 251,4681000000won2024 494,5331000000won▲ +96.7%

Specialized construction activities Ancillary material costs

2008 1,624,8221000000won2024 2,952,0001000000won▲ +81.7%

Site preparation and construction of foundation works and structures Ancillary material costs

2008 745,7121000000won2024 1,236,8681000000won▲ +65.9%

Site preparation and related construction Ancillary material costs

2008 254,4491000000won2024 404,5121000000won▲ +59.0%

Erecting assembling and framing structural parts and masonry works Ancillary material costs

2008 313,0341000000won2024 447,6761000000won▲ +43.0%

Other erecting assembling and framing structural parts and masonry works Ancillary material costs

2008 178,2281000000won2024 384,6801000000won▲ +115.8%

Construction of installing building equipment Ancillary material costs

2008 222,8531000000won2024 477,4971000000won▲ +114.3%

Construction of installing building equipment Ancillary material costs

2008 222,8531000000won2024 477,4971000000won▲ +114.3%

Electrical and communication works Ancillary material costs

2008 340,3441000000won2024 628,9271000000won▲ +84.8%

Electrical works Ancillary material costs

2008 235,2981000000won2024 455,8481000000won▲ +93.7%

Communication works Ancillary material costs

2008 105,0451000000won2024 173,0781000000won▲ +64.8%

Building completion and finishing Ancillary material costs

2008 292,2191000000won2024 608,7091000000won▲ +108.3%

Painting papering and finishing carpentry works Ancillary material costs

2008 120,1011000000won2024 264,5971000000won▲ +120.3%

Glazing works and joinery installation Ancillary material costs

2008 128,2321000000won2024 243,7011000000won▲ +90.0%

Other building completion and finishing Ancillary material costs

2008 43,8851000000won2024 100,4101000000won▲ +128.8%

Repair and maintenance works for construction works and supplementary facilities Ancillary material costs

2008 23,6921000000won2022 21,1021000000won▼ −10.9%

Construction Labour cost

2008 39,837,1941000000won2024 88,653,7231000000won▲ +122.5%

General construction Labour cost

2008 15,876,1931000000won2024 37,397,9551000000won▲ +135.6%

Building construction Labour cost

2008 12,025,5401000000won2024 27,707,3661000000won▲ +130.4%

Residential building construction Labour cost

2008 7,373,5341000000won2024 10,741,4361000000won▲ +45.7%

Non-residential building construction Labour cost

2008 4,652,0061000000won2024 16,965,9311000000won▲ +264.7%

Heavy and civil engineering construction Labour cost

2008 3,850,6531000000won2024 9,690,5891000000won▲ +151.7%

Land subdivision with land improvement Labour cost

2008 244,1451000000won2024 182,8251000000won▼ −25.1%

Construction of civil engineering projects Labour cost

2008 3,606,5071000000won2024 9,507,7641000000won▲ +163.6%

Specialized construction activities Labour cost

2008 23,961,0011000000won2024 51,255,7681000000won▲ +113.9%

Site preparation and construction of foundation works and structures Labour cost

2008 9,403,9711000000won2024 18,852,4681000000won▲ +100.5%

Site preparation and related construction Labour cost

2008 2,437,9871000000won2024 3,559,0231000000won▲ +46.0%

Erecting assembling and framing structural parts and masonry works Labour cost

2008 4,803,3011000000won2024 10,037,5751000000won▲ +109.0%

Other erecting assembling and framing structural parts and masonry works Labour cost

2008 2,162,6811000000won2024 5,255,8701000000won▲ +143.0%

Construction of installing building equipment Labour cost

2008 3,607,7311000000won2024 9,359,4201000000won▲ +159.4%

Construction of installing building equipment Labour cost

2008 3,607,7311000000won2024 9,359,4201000000won▲ +159.4%

Electrical and communication works Labour cost

2008 5,747,9621000000won2024 12,663,1691000000won▲ +120.3%

Electrical works Labour cost

2008 4,029,6071000000won2024 9,700,4201000000won▲ +140.7%

Communication works Labour cost

2008 1,718,3541000000won2024 2,962,7501000000won▲ +72.4%

Building completion and finishing Labour cost

2008 4,875,1261000000won2024 10,380,7101000000won▲ +112.9%

Painting papering and finishing carpentry works Labour cost

2008 2,246,7291000000won2024 5,053,4161000000won▲ +124.9%

Glazing works and joinery installation Labour cost

2008 1,641,4481000000won2024 3,172,5581000000won▲ +93.3%

Other building completion and finishing Labour cost

2008 986,9481000000won2024 2,154,7361000000won▲ +118.3%

Repair and maintenance works for construction works and supplementary facilities Labour cost

2008 326,2091000000won2022 263,6171000000won▼ −19.2%

Construction Cost for welfare work

2008 5,110,2681000000won2024 14,710,2281000000won▲ +187.9%

General construction Cost for welfare work

2008 2,317,6241000000won2024 7,925,5401000000won▲ +242.0%

Building construction Cost for welfare work

2008 1,661,6351000000won2024 6,275,2341000000won▲ +277.7%

Residential building construction Cost for welfare work

2008 990,2321000000won2024 2,889,8981000000won▲ +191.8%

Non-residential building construction Cost for welfare work

2008 671,4021000000won2024 3,385,3361000000won▲ +404.2%

Heavy and civil engineering construction Cost for welfare work

2008 655,9881000000won2024 1,650,3061000000won▲ +151.6%

Land subdivision with land improvement Cost for welfare work

2008 36,4441000000won2024 32,3071000000won▼ −11.4%

Construction of civil engineering projects Cost for welfare work

2008 619,5441000000won2024 1,617,9981000000won▲ +161.2%

Specialized construction activities Cost for welfare work

2008 2,792,6441000000won2024 6,784,6881000000won▲ +142.9%

Site preparation and construction of foundation works and structures Cost for welfare work

2008 1,211,7681000000won2024 2,445,1301000000won▲ +101.8%

Site preparation and related construction Cost for welfare work

2008 375,1601000000won2024 550,1951000000won▲ +46.7%

Erecting assembling and framing structural parts and masonry works Cost for welfare work

2008 566,2051000000won2024 1,174,0131000000won▲ +107.3%

Other erecting assembling and framing structural parts and masonry works Cost for welfare work

2008 270,4031000000won2024 720,9221000000won▲ +166.6%

Construction of installing building equipment Cost for welfare work

2008 390,4711000000won2024 1,285,6521000000won▲ +229.3%

Construction of installing building equipment Cost for welfare work

2008 390,4711000000won2024 1,285,6521000000won▲ +229.3%

Electrical and communication works Cost for welfare work

2008 630,5781000000won2024 1,801,4701000000won▲ +185.7%

Electrical works Cost for welfare work

2008 450,3161000000won2024 1,393,0391000000won▲ +209.3%

Communication works Cost for welfare work

2008 180,2621000000won2024 408,4311000000won▲ +126.6%

Building completion and finishing Cost for welfare work

2008 528,1771000000won2024 1,252,4361000000won▲ +137.1%

Painting papering and finishing carpentry works Cost for welfare work

2008 240,9401000000won2024 597,3361000000won▲ +147.9%

Glazing works and joinery installation Cost for welfare work

2008 186,5841000000won2024 414,9901000000won▲ +122.4%

Other building completion and finishing Cost for welfare work

2008 100,6521000000won2024 240,1101000000won▲ +138.6%

Repair and maintenance works for construction works and supplementary facilities Cost for welfare work

2008 31,6471000000won2022 36,6431000000won▲ +15.8%

Construction Depreciation

2008 1,495,7761000000won2024 3,352,1211000000won▲ +124.1%

General construction Depreciation

2008 618,7701000000won2024 1,626,7791000000won▲ +162.9%

Building construction Depreciation

2008 337,5681000000won2024 1,216,5731000000won▲ +260.4%

Residential building construction Depreciation

2008 161,1321000000won2024 590,1451000000won▲ +266.2%

Non-residential building construction Depreciation

2008 176,4351000000won2024 626,4281000000won▲ +255.0%

Heavy and civil engineering construction Depreciation

2008 281,2021000000won2024 410,2061000000won▲ +45.9%

Land subdivision with land improvement Depreciation

2008 8,6901000000won2024 6,3911000000won▼ −26.5%

Construction of civil engineering projects Depreciation

2008 272,5111000000won2024 403,8151000000won▲ +48.2%

Specialized construction activities Depreciation

2008 877,0061000000won2024 1,725,3421000000won▲ +96.7%

Site preparation and construction of foundation works and structures Depreciation

2008 374,7191000000won2024 579,5241000000won▲ +54.7%

Site preparation and related construction Depreciation

2008 120,1241000000won2024 155,1241000000won▲ +29.1%

Erecting assembling and framing structural parts and masonry works Depreciation

2008 147,8271000000won2024 184,9761000000won▲ +25.1%

Other erecting assembling and framing structural parts and masonry works Depreciation

2008 106,7671000000won2024 239,4241000000won▲ +124.2%

Construction of installing building equipment Depreciation

2008 107,5491000000won2024 277,3831000000won▲ +157.9%

Construction of installing building equipment Depreciation

2008 107,5491000000won2024 277,3831000000won▲ +157.9%

Electrical and communication works Depreciation

2008 240,2711000000won2024 570,6421000000won▲ +137.5%

Electrical works Depreciation

2008 132,3111000000won2024 399,6001000000won▲ +202.0%

Communication works Depreciation

2008 107,9601000000won2024 171,0421000000won▲ +58.4%

Building completion and finishing Depreciation

2008 146,5701000000won2024 297,7941000000won▲ +103.2%

Painting papering and finishing carpentry works Depreciation

2008 63,4231000000won2024 120,9101000000won▲ +90.6%

Glazing works and joinery installation Depreciation

2008 63,3661000000won2024 138,4851000000won▲ +118.5%

Other building completion and finishing Depreciation

2008 19,7801000000won2024 38,3991000000won▲ +94.1%

Repair and maintenance works for construction works and supplementary facilities Depreciation

2008 7,8941000000won2022 9,6811000000won▲ +22.6%

この統計について

Construction Industry Survey· - 건설업체 → 건설관련기관(6개) → 국가데이터처

主な用語
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자 もっと見る

원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자가 발전용으로 사용한 모든 연료의 사용금액과 전기료, 가스료, 수도료 등을 말함급여총액 : 손익계산서의 판매비와 관리비 중 임원급여, 급료와 임금, 제수당 및 상여금, 잡급과 공사원가명세서의 노무비 중 급여, 임금, 제수당, 기타급여를 포함하며, 해외 건설공사의 경우 현지 고용한 외국인 노무자에 대한 급여는 제외함퇴직급여 : 손익계산서 및 공사원가명세서상의 퇴직급여 및 당년도 퇴직급여충당금전입액이 포함복리후생비 : 종업원에 대한 급여 이외의 위생, 보건, 위안, 요양 등 종업원의 복지와 후생을 위하여 지출한 제비용을 말하는데, 장기 결근자에 대한 급여, 양로연금, 종업원 레크레이션을 위한 운동시설, 영화, 여행, 운동회개최 등을 위한 제비용을 포함대손상각비 : 손익계산서상의 대손상각비로서 외상매출금, 받을 어음 등 채권의 추산액 또는 경상적인 대손상각을 말함임차료 : 건설활동을 위하여 제3자로부터 건물, 장비, 토지 등을 임차하였을 경우 그에 대한 임차료를 말함. 해외건설공사의 경우 외국인으로부터 임차한 대가로 지불한 임차료는 제외세금과공과 : 건설업활동과 관련된 각종 세금 및 공과금으로 등록세, 재산세, 취득세, 사업소득세, 자동차세, 협회비 등 공사원가 및 판매비와 관리비 부문에 포함되는 모든 세금과 공과금을 말한다.해외공사의 경우 외국정부 등에 납부한 조세공과는 제외하였으며 기타영업비용에 포함하였다.감가상각비 : 건물, 건설장비 등의 유형고정자산에 대한 감가상각비와 무형자산에 대한 상각비의 합계를 말함외주공사비 : 다른 업체에 하도급을 주었을 경우 하도급 업체에서 시공한 기성 부분에 대하여 지출하였거나 지출하여야 할 외주공사비를 말하며 연차 공사의 경우에는 조사대상 기간에 지출한 금액 또는 지출하여야 할 금액을 말함기타영업비용 : 상기 언급한 [원재료비, 보조재료비, 수선비, 수도광열비, 급여총액, 퇴직급여, 복리후생비, 임차료, 세금과공과, 감가상각비, 대손상각비, 외주공사비]를 제외한 손익계산서 및 공사원가명세서상의 건설 활동을 위하여 지출한 비용의 합계를 말함. 해외 건설공사의 경우에는 외국인에게 지불한 급여 및 임차료, 외국정부에 지출한 조세공과 등을 기타영업비용에 포함시킴부가가치 : 부가가치는 기업이 산업 활동을 한 결과 생산물의 가치 등에 새로 부가한 가치를 의미하며 이 조사의 부가가치는 다음과 같이 구함부가가치 = 급여총액 + 퇴직급여(퇴직급여충당금전입액 포함) + 복리후생비(보험료 포함) + 임차료 + 세금과공과 + 대손상각비 + 건설영업이익 + 납부부가가치세건설공사내역 : 건설공사내역은 조사기준년도에 이룩한 모든 공사를 건별로 계약액, 당년도 기성액 등을 공사종류별, 발주자별 및 공사 지역별로 구분 조사해외공사의 경우 외환금액은 조사기준연도 12. 31. 기준 외환은행 환율에 의한 환산치임계약종류 : 도급방법에 따라 원도급과 하도급으로 구분 조사하였음. 원도급이란 발주자로부터 1차적으로 도급받은 경우이며, 하도급이란 재도급 또는 하청을 말함이 조사에서는 국내 타 건설 업체로부터 도급받은 경우 하도급으로 간주하였으며 국내 건설회사가 아닌 외국건설 회사나 국내 종합무역상사 등에서 하도급 받은 경우에는 원도급으로 하였음. 또한 건설회사의 자기 건설이나 산하기업, 모기업을 위한 직영공사인 경우 원도급으로 하였음.기성액(공사액) : 기성액(공사액)이라 함은 건설업체에서 공사의 완공여부나 대금의 수취여부 등과는 관계없이 당해년도에 시공한 공사액을 말함. 즉, 공사수주금액 중 공사의 일부를 다른 업체에 하도급(원도급자의 외주공사액)을 준 경우에는 원도급자의 기성액에서 제외하였음당해년도 계약액(수주액) : 조사대상 업체가 발주자 또는 원도급자와 조사기준년도에 체결한 공사 계약액의 합계미기성액 : 조사기준년도에 시공하지 못하고 차년도로 이월된 공사액『당년도계약액 및 이월된 공사액 - 당년도 기성액』= 미기성액발주자 : 발주자라 함은 건설공사를 건설업자에게 도급하는 자를 말함. 다만, 수급인으로서 도급받은 건설공사를 하도급하는 자를 제외함도급 : 도급이라 함은 건설공사를 완성할 것을 약정하고, 상대방이 그 일의 결과에 대하여 대가를 지급할 것을 약정하는 계약원도급공사 : 발주자로부터 직접 건설공사를 완성할 것을 약정한 공사하도급공사 : 발주자로부터 건설공사를 도급받은 건설업자로부터 재 도급받은 건설공사를 말함조직형태 : 경영주체인 각 기업체의 법적 조직형태를 말하며 이 조사에서는 회사법인,회사이외의 법인 및 개인의 세 가지 형태로 구분법인 : 상법, 민법, 특별법에 의하여 설립되고 법인 등기를 완료하여 법인격을 취득하고 있는 기업체기술자, 기술공 : 건설공사의 설계 및 시공에 관한 전반적인 감독업무를 수행할 수 있는 자, 또는 전문직기술자가 지시한 작업내용을 원활하게 응용하여 기술공의 업무를 충분히 수행할 수 있는 자피고용자 : 일정한 산출기준에 의하여 임금, 봉급 또는 이에 준하는 형식의 급여를 받고 그 기업체에 고용되어 있는 모든 남여 종업원을 말하는데, 이에는 상용은 물론 임시 및 일용 종업원도 포함시켰음. 그러나 장기결근자(3개월 이상) 및 군복무자 등은 제외하였고, 해외공사의 경우에는 해외에서 근무하는 우리나라 피고용자만 조사하였고 외국에서 현지 고용한 외국인 피고용자는 제외함개인 : 법인체가 아닌 개인소유의 기업체를 말하는 것으로서 여기서는 법인격이 없는 조합과 같은 임의단체도 포함자 본 금 : 조사기준년도 12.31. 현재로 납입이 완료된 자본금 또는 출자금액종사자수 : 종사자라 함은 그 기업체의 공사현장 혹은 사무실 등을 가리지 않고, 조사대상 기간 중 건설업을 위한 업무에 종사한 피고용자수와 사업주 및 무급가족종사자수의 합계상용종사자 : 1년 이상의 고용계약에 의하여 실제의 취업시간에 관계없이 일정한 정액급여를 받는 종사자사무 및 기타 종업원 : 공사현장업무에는 직접 관여하지 않고 관리직, 전문직, 사무직 업무에 종사하는 자와 이들의 보조원 즉 급사, 사환, 수위, 승용차의 운전사 등을 말함기능공 : 건설공사의 시공에 직접 종사하는 자로서 ① 고등학교 졸업자와 ② 6개월 이상 조직적인 기술습득을 요하는 직종에서 1년 이상 경험을 가진 자, 또는 국가에서 공인하는 동등한 자격을 가진 자로서 통칭 숙련공을 말함임시종사자 : 1년 미만의 고용계약에 의하여 취업일수 및 취업시간에 따라 임금을 받는 잡부,인부,단순노무자 등을 포함한 현장근로 종사자사업주 및 무급가족종사자 : 사업주(출자자포함)와 그의 가족으로서 업체의 운영을 위하여 사무 또는 노무에 통상 작업시간의 ⅓ 이상을 종사하되 일정한 봉급이나 임금을 받지 않은 자를 말함. 사업주의 가족이라도 상시 근무에 종사하고 이에 대한 임금 또는 봉급의 형식으로 급여를 받은 자는 피고용자에 포함연간 급여액 : 조사대상기간에 정기 또는 부정기를 가리지 않고 피고용자에게 노무의 대가로 지급된 모든 현금급여,조사기준년도 이전의 급여로서 체불되었던 것을 조사기준년도 중에 지급한 것은 제외하고, 반면에 조사기준년도 중에 지급하여야 할 급여로서 미지급된 것은 포함매 출 액 : 매출액이라 함은 건설업체에서 당년도에 시공한 공사수익금액과 분양금액 등을 포함함. 미완성공사는 공사가 진행된 정도에 따라 수익이 실현된 것으로 봄.단, 공사수주 금액 중 공사의 일부를 다른 업체에 외주를 준 경우에는 제외(건설비용의 외주공사비로 조사)건설비용 : 1년간의 건설공사에 대하여 발생한 비용의 총계를 말함. 즉 건설공사원가명세서상의 경비와 손익계산서상의 판매비와 관리비를 말하는데, 건설업 이외의 타 산업을 겸하는 기업체는 겸업부문의 비용은 제외

何のために作るのか
우리나라 건설업부문의 구조 및 산업활동 실태를 파악하여 정책수립에 필요한 기초자료 제공 활용분야 : 건설관련 정책수립, GDP.산업연관표 및 GRDP작성, 월간조사 모집단 자료로 활용
何を調べているのか
기업체

🔴 この説明は統計を作成した機関が自ら書いたものです。DATA CLOCK KOREA が解釈したり要約したりはしていません。 原文は韓国語です。翻訳すると「機関が書いた説明」ではなくなるため、そのまま掲載しています。

出典

機関
국가데이터처
統計表
산업세분류 및 조직형태별 총괄
提供
KOSIS 국가통계포털
期間
2008 ~ 2024
取得日
2026-08-29
処理
KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
元データを見る →

この分野の他の調査